Tuesday, June 24, 2014

About Multipurpose Bridge of Padma


                      Short Description of the Padma Bridge:

Padma Bridge plan
The Padma Multipurpose Bridge Mission (PMBP), almost 40 km south west of Dhaka, contains a newfangled permanent overpass of the Padma River in Bangladesh, which will be made up of bridge around 6.15km long, main river preparation workings & just about 13.6 km line of transportation and bridge finish services, together with toll piazzas, facility zones and place of work.



 Pre-feasibility Study
1998-1999
-
GoB Fund

Feasibility Study
2003-2005
-
JICA Grant

Detailed Design and Procurement
2009-2001
-
ADB TA Loan

Construction & Implementation



predictable in 2014
 Land Acquisition
About 1100 hecto
 Locale
Louhajong,  Munshiganj to Shariatpur & Madaripur
 River Training
14 km (1.6 km in Mawa + 12.4 km in Janjira).
 Carries
Motor vehicles & Railway
 Designer
Maunsell AECOM
 Approach Road
12 km
 Material
Steel
 Total length
6,150 m (20,180 ft)
 Width
18.10 m (59.4 ft)
 Construction end
expected in 2018



The Padma bridge will be the lengthiest bridge of it is form by way of 6.15 kilometer of distance. The Padma River brings the third maximum water release of all the rivers in the world but it is placed as the highest in positions of remains means of transport and is one of the biggest and greatest challenging river used for which bridge manufacture has been struggled.


 The leading bridge arrangement would bring a four-lane highway, and have requirements for future putting in place of a single pathway dual devices railway as well as other accommodations together using gas, power communication and telephone communication lines. 


The core bridge is a two level steel truss framework with road traffic on the higher level and rail on the minor level performing with a strengthened existing level lump.

Multipurpose Bridge of Padma willpower join Louhajong,  Munshiganj to Shariatpur & Madaripur  connecting the south-west of the nation  to northern & eastern districts. The development hiding place three districts like Madaripur  & Shariatpur (South bank- Janjira), Munshiganj (Mawa point-North bank).

Fund of Padma Bridge & barrier

Transportations department look for to distract tk. 510 core to highway plans. Chinese firm, China Major Bridge Engineering Co Ltd, has become Tk12,000 crore agreement for making the much talked around Padma bridge.


The finance for the considerably publicized Padma Bridge mission appears to have come upon alternative problem as the transportations department try to find distract tk.510 crore starting the plan's distribution for financial 2013-14 to highway structures. The plan budget would growth due to the delay & the studied budgets possibly will be strong-minded next the service provider gives in to final suggestions, supplementary the authorized.

Certain tk. 6,852 crore was assigned for the top importance development this financial year, but the sponsorship partition distracted Tk. 4,252 crore starting the fund to finance twenty percentage dearness pocket money for public servants.
 



Now tk. 510 crore from the assignment present distribution of tk. 2,600 crore to reserve a host of developments. January 31, the government wished the World Bank to withdraw its finance for the Padma Bridge mission as it could postponement the operation. The government then decided to implement the mission with its own capitals.

In the meantime, the planning ministry has wished-for slashing the roads division's unique distribution of tk 2,473 crore by way of Tk 403 crore.

On the other hand the communications ministry instead required additional tk. 869 crore from the planning ministry for the ongoing and innovative plans. The government would expend on the mission the $200 million it established as allowance as of India. As well, it plans to increase $500 million to $1billion by variable sovereign bonds on the international marketplace by October, official wishing anonymity said by finance department. 

Besides, the governments think through setting sideways a part of the country's external currency reserve for the development. And the central bank has at present given its primary agreement to the plan. 

The whole thing measured, I do not think it is unreasoning to accomplish that we are accomplished of funding the Padma Bride with on our specific capitals.


Financial By three international organizations

The government has decided three international organizations primarily. It has asked two Korean and a Chinese organization to give in to their financial applications. Chinese firm, China Major Bridge Engineering Co Ltd, has become Tk12, 000 crore agreements for making the much talked around Padma Bridge. 



It takes remained conveyed that 60 to70 present of the development price will be in the form of imports of capital equipment, resources, consultancy services etc. By means of the overall development price predictable to be tk. 23,000 crore, let us take up that the importance price will be tk. 16,000 crore (approximately 70%) completed the following 4 years. That converts to a tk. 4,000 crore yearly growth in the require for US dollars. 